top of page
Search

Kaizen Continuous Improvement Starts With the Number Nobody Wrote Down

Writer: Toby Hoy
Toby Hoy
17 minutes ago
10 min read

 

Karen spent a whole weekend rebuilding the oil-change process at her repair shop. New bay layout. New parts cart. New check-in script at the front counter. Three weeks later, a customer asked her a simple question: "Are oil changes faster now?" She had no idea. Nobody did. If you've ever launched a round of kaizen continuous improvement and walked away unsure whether anything got better, this post is for you.

 

Without the old number, you can't tell whether you improved anything. You changed something.

 

Changing feels like progress. A new layout looks like progress. A team buzzing on Monday morning sounds like progress. None of those tells you whether the work got faster, cheaper, or better. Only a before-and-after comparison tells you, and most teams skip the before because measuring feels slow and changing feels like leadership.

 

Below, you'll get the full story of Karen's shop, why big overhauls bury the truth about what worked, and a three-step baseline you'll run on one job this week.

 

What kaizen continuous improvement means, and the half people skip

 

Kaizen is a Japanese word for change for the better. In business, it means small, steady improvements made by the people doing the work every day, with no finish line.

 

Toyota built the model. In 2023, Toyota employees submitted about 810,000 improvement suggestions, an average of 14.4 per person, according to Toyota Times. Over seven decades, the company's suggestion system has logged roughly 50 million ideas. Those numbers get quoted a lot. Most people hear them and copy one part: small changes, and lots of them.

 

The part people skip is the measuring. Taiichi Ohno, the engineer behind the Toyota Production System, put the idea plainly: "The standard is only a baseline for doing further kaizen."

 

Read the sentence twice. The baseline comes first. You write down how the work runs today, measure it, and then change something. Skip the baseline, and every improvement turns into an opinion contest. The loudest person in the room wins, and the loudest person is often wrong.

 

Your takeaway: before you change a single step in any process, write down how the process runs right now. Skip the version in the manual. Write the version your team runs on a normal Tuesday.

 

The weekend overhaul at Hollis Street Auto

 

Hollis Street Auto is a three-bay independent repair shop. Karen owns the place. Tony is her most experienced technician. Megan runs the front counter and checks in every customer.

 

Oil changes pay the bills at a shop like Karen's. Customers want them fast, and a slow oil change backs up every other job in the building. Karen decided the process needed fixing, and she decided to fix it all at once.

 

On a Friday night, she and Tony rearranged the bays so every oil-change car went to Bay 1. On Saturday, she bought a rolling parts cart and loaded the cart with filters, drain plugs, and shop towels, so nobody had to walk to the parts room. On Sunday, she wrote a new check-in script for Megan: six questions for every customer, covering mileage, recent warning lights, and the next service due.

 

Monday felt great. The shop looked sharper. The team liked the cart, at least for the first few days. Karen told a friend the shop had "gone lean."

 

Three weeks later, a regular customer waited 50 minutes for an oil change and asked Karen, right at the counter, whether the new setup was faster. Karen opened her mouth and had nothing to say.

 

She asked her team. Tony said the cart slowed him down because he kept walking around the cart to reach the lift controls. Megan said the new check-in script added two or three minutes per customer. Karen believed the Bay 1 layout saved time because oil-change cars no longer waited behind brake jobs.

 

Three people, three opinions, and zero numbers.

 

Nobody had timed an oil change before the weekend. Without the before, nobody could judge the after. Karen had spent a weekend and a few hundred dollars, and she had nothing to show for either except a feeling.

 

Your takeaway: list the last three changes you made at work. Next to each one, write the number you had before the change. Every blank spot on the list marks a guess you've been treating as a result.

 

Why big overhauls hide what worked

 

Karen's weekend has a defense, and the defense deserves a fair hearing. Swisslog, a warehouse automation company, makes the case in its Kaizen Paradox white paper: some problems need a rebuild, and a string of small upgrades sometimes blocks the bigger investment a business needs. Fair point. A shop with a broken lift doesn't need a better parts cart. The shop needs a new lift.

 

The trouble starts when a big change ships as one bundle. An IndustryWeek analysis of kaizen and kaikaku (the Japanese term for radical change) argues breakthroughs still require many small steps, and warns blitz-style overhauls skip the check-and-adjust phase. Karen's weekend did exactly this. She changed three things at once and checked none of them.

 

Three changes at once means three unknowns. One change helps, one hurts, one does nothing, and the total looks flat. Worse, a good change sometimes hides behind a bad one, and the team throws out both.

 

Big overhauls also kill learning. When a bundle of changes flops, the team blames "the new system" and drifts back to the old way. When a bundle of changes succeeds, nobody knows which piece to keep, which piece to drop, or which piece to spread to the next process.

 

Your takeaway: if you need a big change, break the change into pieces and test one piece at a time. A rebuild done in sequence still counts as a rebuild. The difference is you'll know which pieces earned their place.

 

The restart: baseline first, one change at a time

 

Karen called a do-over. She kept the ideas. She scrapped the guessing.

 

First, she moved everything back. Old bay order, cart parked in the corner, old check-in routine at the counter. For one week, the shop ran oil changes the old way while Karen did something new: she wrote the current oil-change steps on one sheet of paper, fourteen steps from key drop to key return, and taped the sheet to the wall by Bay 1.

 

Then she timed ten oil changes from key drop to key return. The average was 38 minutes. The fastest ran 33 minutes. The slowest ran 46 minutes.

 

Karen didn't love those numbers. A 46-minute oil change wasn't news to her customers. The number was only news to Karen. She wrote the numbers down anyway. A bad baseline is the best gift a future improvement ever gets, because every gain shows up clearly against the bad number.

 

Now Karen had a before.

 

In week two, she brought back one change: the cart. Only the cart. Tony grumbled. Ten timed oil changes later, the average sat at 31 minutes. Seven minutes saved per car, on a job the shop runs about forty times a week. That's close to five hours of technician time back every week.

 

Tony had a confession. With the bays back in the old order, the cart sat on the open side of the lift, out of his way. The cart never slowed him down. The new layout had parked the cart in front of the lift controls. The cart worked fine. The layout made the cart look bad.

 

In week three, Karen tested the check-in script on its own. Megan ran all six questions with every customer. Bay time didn't move at all. Customers spent longer at the counter and got their cars back no sooner. Karen dropped the script.

 

Put the pieces together, and Karen's weekend finally made sense. The cart saved about seven minutes per car. The new layout put the cart in Tony's way and gave back most of those minutes. The check-in script added a few more minutes at the counter. Add the pieces up, and the overhaul looked like a wash. Two of the three changes fought the one change worth keeping, and nobody knew because nobody had measured anything.

 

The Bay 1 layout went on the list for a later test, with a fresh before number of its own.

 

Your takeaway: when a change disappoints, run a do-over before you give up on the idea. Go back to the old way, measure it, and bring back one piece at a time.

 

IF YOU NEVER MEASURED THE BEFORE, YOU'RE GUESSING ABOUT THE AFTER.

 

The one-page sheet does more than you think

 

The sheet taped by Bay 1 turned out to be the most useful thing Karen made all month, and the sheet cost her one piece of paper.

 

Once the fourteen steps hung on the wall, the team started reading them. Tony noticed the shop checked tire pressure twice during every oil change: once at the start and once at the end. Megan noticed nobody wrote the next-service sticker until after the customer had already paid, which meant a second trip out to the car. Neither problem showed up during the weekend overhaul, because nobody had looked at the steps. Everybody had looked at the new stuff.

 

Both fixes went on the test list. Each one waits its turn, with ten timed runs before and ten after.

 

The written steps also settled arguments. When two technicians did the job two different ways, the sheet showed the difference in black and white. The team picked one way, tested it, and wrote down the winner. Ohno's baseline did exactly what he said a baseline does: the written steps became the starting line for the next improvement.

 

Your takeaway: tape your one-page steps where the work happens, not in a shared drive nobody opens. Ask the people doing the work to mark anything odd. Odds are, your next three improvement ideas already sit on the page.

 

Run your own baseline in three steps

 

You don't need special software, a consultant, or a week off. You need one job and ten repetitions.

 

•        Pick one routine job you or your team do at least ten times a week: oil changes, invoice approvals, new-client setup, month-end reports, anything with a clear start and a clear finish.

•        Write today's steps on one page, including the workarounds everybody uses and nobody admits. If two people do the job two different ways, write both. You've found your first problem.

•        Time ten runs from start to finish. Record the average and the slowest run.

 

Use the clock on your phone or a column in a spreadsheet. The tool doesn't matter. The habit of writing the number down does.

 

Then, and only then, change one thing. Time ten more runs. Compare.

 

Ten runs matter. One fast run proves nothing, because people speed up when somebody holds a stopwatch. Ten runs smooth out the good days and the bad days and give you a number you can trust. The average tells you where you stand. The slowest run tells you where the pain lives.

 

Your takeaway: the number to track is your baseline average of ten runs, taken before any change. Measure every improvement claim against the baseline, including yours.

 

Three baseline mistakes to avoid

 

Timing your best day. If you only measure on a quiet Tuesday with your strongest person, your baseline will look great, and every change will look worse. Spread your ten runs across normal days, busy days, and the end of the week.

 

Moving the finish line. Karen measured from key drop to key return. If week two had measured from car on the lift to car off the lift, the 31 minutes would mean nothing. Write your start point and your finish point at the top of the page, and never change them mid-test.

 

Measure the process, not one person. If Tony ran every timed oil change, Karen would have measured Tony. Spread the ten runs across the people who do the job. You're testing the process, not grading the people.

 

Your takeaway: at the top of your one-page sheet, write three things before the first run: the start point, the finish point, and who ran each timing.

 

Let the baseline tell you how big to go

 

The baseline settles the old fight between small steps and big rebuilds. Look at two numbers: your fastest run and your target.

 

If your fastest run already beats the target, the process works. The problem is consistency. Small steps aimed at the slow runs will get you there, one change at a time.

 

If even your fastest run misses the target, small steps won't close the gap. The process needs a bigger change. You still test the bigger change in pieces, but you stop pretending a tweak to the paperwork will fix a layout problem.

 

Karen wanted to promise customers an oil change in 30 minutes or less. Her fastest baseline run took 33 minutes. Even on her best day, the old process missed the promise. A bigger change was fair game, and the cart turned out to be the bigger change. The cart brought the average down to 31 minutes. The next tests chase the last stubborn minutes, and those tests will be small ones.

 

Without the baseline, Karen would have argued about rebuilds versus tweaks for months. With the baseline, the decision took one look at a sheet of paper.

 

Your takeaway: write your target next to your fastest baseline run. If the fastest run beats the target, go small and steady. If the fastest run misses, go bigger, and still test one piece at a time.

 

Why small steps won at Toyota

 

Toyota launched its suggestion system in 1951, modeled on a program Toyota leaders saw at Ford. Toyota didn't reach 810,000 suggestions a year by hanging a box on the wall and hoping. Toyota's own 1973 account of the program shows the share of suggestions adopted climbing from 29% in 1956 to 76% in 1972. The company credited a carefully designed submittal procedure for the jump.

 

Read the lesson there. Toyota improved the improvement process. The system for proposing, testing, and judging ideas got better, so more ideas earned a yes.

 

A baseline does the same job for you. An idea with a before number and an after number wins arguments. An idea without numbers starts arguments. When Karen walked into her next team meeting with 38 minutes and 31 minutes on a sheet of paper, nobody argued about the cart again, including Tony.

 

Your takeaway: bring two numbers to every improvement conversation, the before and the after. If you only have one, finish the measuring before the meeting.

 

Start your kaizen continuous improvement this week

 

Kaizen continuous improvement pays off on the days you measure and stalls on the days you guess. Here's your week:

 

•        Monday: pick one routine job.

•        Tuesday: write today's steps on one page and tape the page where the work happens.

•        Wednesday through Friday: time ten runs and record the average.

•        Next Monday: change one thing, and only one.

 

Measuring the before is half of kaizen. The other half starts after the improvement works. The companion episode of Toby Talks covers the second half: why your best fixes slide back to the old way, who usually undoes them, and how a 90-day hold rate catches the slide early. Watch on YouTube or listen wherever you get podcasts, and find more posts at toby-talks.com.

 

LEAD . IMPROVE . GROW

 
 
 

Comments


© 2025 Tobias C Hoy. All rights reserved.

bottom of page